PTBA have 8 (eight) different coal types:
.jpg)
All coal brands supplied by PTBA are low ash, low sulphur products and are ideal for users operating in sensitive environments.
With three dedicated load-ports available, PTBA is perfectly located to service all world markets and fulfil to customer's specific needs.
PTBA sells coal to domestic and export markets at prices will that earn maximum return. Sales is made under long term sales contract and through spot market, while selling price is always based on international thermal coal prices.
.jpg)
COAL HANDLING AND TRANSPORTATION
Tanjung Enim
PTBA operates three stockpiles in the Tanjung Enim Mining Unit. Each stockpile is equipped with feed breakers and associated conveying system with a capacity of 1,500 – 1,700 tons per hour (tph) and coal train-loader station with a capacity of 2,000 – 2,800 cubic meter per hour.
The first stockpile stored coal form Air Laya and Muara Tiga Besar mining unit. The second stockpile stored coal only from Muara Tiga Besar mining unit. Meanwhile, another stockpile stored coal from Banko Barat mining unit.
A portion of coal at Air Laya stockpile is transported through a conveyor to Bukit Asam Power Plant.
Coal from the stockpile is transported via train to port. PTBA has a long-term contract with state-owned railway company PT Kereta Api Indonesia to transport coal to Tarahan Coal Terminal in Lampung or Kertapati Port in Palembang. The Tarahan Coal Terminal is 410 km from Tanjung Enim to Lampung and the Kertapati Port is 190 km from Tanjung Enim to Palembang.
The train to Tarahan Coal Terminal consist of 46 wagons with a capacity of 50 tons each, while the train to Kertapati Port consists of 35 wagons with a capacity of 30 ton each. At Tarahan Coal Terminal and Kertapati Port, PTBA also has stockpile equipped with a ship loader.
Ombilin
Coal extracted from the ombilin mine is screened and crushed before being delivered to the Ombilin Power Station, or an adjacent rail yard for delivery to a cement company in Padang, West Sumatera, or Teluk Bayur Port.
Coal transported over the Ombilin rail line has been old for upon delivery to the rail yard. The Ombilin rail line delivers coal 155 km away to the Padang Cement Factory and the Teluk Bayur Coal Terminal.
Tarahan Coal Terminal
Most of the coal is shipped from Tarahan Coal Terminal. Fully owned and operated by PTBA, this world class facility is located at Bandar Lampung, approximately 410 km by rail from the Tanjung Enim mine site.
To support heightened activities at coal handling and transporting area, PTBA is currently upgrading the capacity of Tarahan Port through the construction of new jetty that can accommodate a cape size vessel. The capacity will increase around to 25 million tons per year from 12 million tons per year.
Acceptable Vessel Size
| Max. LOA | : | 229.50 meters |
| Max. Beam | : | 32.25 meters |
| Length of Wharf | : | 175 meters |
| No. of Mooring Dolphins | : | 2 Dolphins & 4 Bollards |
| Distance between Dolphins | : | 24.5 meters |
| Depth of Berth | : | 12.0 meters - Tropical draft |
| Depth of Turning Basin | : | 13.6 – 20.0 meters |
| Channel | : | Normal manoeuvres - No Channel |
| Max. Permissible Draft | : | 15 meters |
| Air Draft for Alongside | : | Minimal 14.75 m |
| Under Keel Clearance | : | 1 meter while on berth, 1 meter while on turning basin |
| Water Density | : | 1.020 – 1.022/Tropical |
| Cargo & Storage Factor | : | in Bulk - 42 up to 44 CF/MFT |
| Tidal Situations | : | MHWS 1.45 m |
| Mean Tide | : | 0.80, MLWS 0.15 m |
Loading Facilities
| Out reached/shuttle | : | 29.5 m – elevation angle 15 degree |
| Clear height | : | 15.0 above MHWS |
| Travelling Distance | : | 120 m |
| Loading rate | : | 25,000 (on WWDSHINC basis) |
| Discharge Capacity | : | 5,000 tph |
| Total Capacity of Stockpile | : | 560,000 MT |
| Designed Throughput | : | 12 million tons/year |
Kertapati Port
The Kertapati barge loading port is situated on 10.2 hectares on the banks of the Musi River near Palembang. It is also fully owned and operated by PTBA and handles coal for both domestic and regional export markets. The capacity of the facility at the Kertapati is 2.5 Mtpa.
Loading Facilities
| Length of Jetty | : | 100 meters |
| Width of Jetty | : | 8 meters |
| Max. Permissible Draft | : | 120 m |
| Max. Permissible Barge | : | 300 ft x 70 ft x 18 ft (< 8,000 tonnes) |
| Loading rate | : | 8,000 tpd (WWDSHINC) |
| Total Capacity of Stockpile | : | 50,000 MT |
Teluk Bayur Coal Terminal
Servicing the ombilin coal mine operation, the Teluk Bayur Coal Terminal, located near Padang, West Sumatera, is fully owned and operated by PTBA. Situated on 2.81 hectares, the facility is also utilized by other local coal producers and has a design capacity of 2 million tonnes throughput per year.
Acceptable Vessel Size
| Max. Vessel | : | 40,000 DWT |
| Length of Wharf | : | 185 meters |
| No. of Mooring Dolphins | : | 8 |
| Distance between Dolphins | : | 35meters |
| Depth of Berth | : | 11 meters - Tropical draft |
| Depth of Turning Basin | : | 10 meters |
| Channel | : | Normal manoeuvres - No Channel |
| Max. Permissible Draft | : | 10.5 meters |
| Air Draft for Alongside | : | Max. 12.3 meters (high tide) |
| Under Keel Clearance | : | 0.5 meter while on berth 0.5 meter while on turning basin |
| Water Density | : | 1.020 Tropical |
| Cargo & Storage Factor | : | in Bulk – 42 up to 44 CF/MT |
| Tidal Situations | : | MHWS : 0.6 – 0.7 m MLWS : 0.1 – 0.2 m |
| High of Jetty from High Tide | : | 1.0 meters |
| High of Jetty from Low Tide | : | 2.5meters |
Loading Facilities
| Out reached/shuttle | : | 25 m – elevation angle 15 degree |
| Clear height | : | 20 m above Jetty |
| Travelling Distance | : | Shifting of Vessel |
| Loading rate | : | 10,000 tonnes per day WWDSHINC |
| Capacity of Loader | : | 1,000 tph/design |
| Total Capacity of Stockpile | : | 90,00 |